Editing Ütközet hydroelectric power plant
From Halopedia, the Halo wiki
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 4: | Line 4: | ||
==Background== | ==Background== | ||
The main complex of the power plant was located in a barren and mountainous region of Reach, on a mountain ridge overlooking a desert basin. Circa [[2507]], | The main complex of the power plant was located in a barren and mountainous region of Reach, on a mountain ridge overlooking a desert basin. Circa [[2507]],<ref name="nightfall"/> a large river that had previously run down from the plateau to the basin was harnessed by Reach's settlers to produce energy, with a dam constructed in a narrow canyon not far from the cliff edge. With the dam in place, most of the river's former bed below it had turned into dry land, where the power station had also been constructed. The power station itself followed the general architectural direction of Reach's pioneer structures; it was composed of multiple rounded sections of structures and built mostly of concrete.<ref name="power"/> | ||
A small fraction of the river ran through the facility, down to the bottom of the basin, where the river had eroded a wide and deep canyon, which now had water only in its very bottom. The river had also been impounded further downstream to the southwest to form a large water reservoir.<ref>'''Halo: Reach''', campaign level ''[[Tip of the Spear]]''</ref> | A small fraction of the river ran through the facility, down to the bottom of the basin, where the river had eroded a wide and deep canyon, which now had water only in its very bottom. The river had also been impounded further downstream to the southwest to form a large water reservoir.<ref>'''Halo: Reach''', campaign level ''[[Tip of the Spear]]''</ref> |