61,078
edits
m (→Retaliation: Link cleanup) |
m (→Escharum's Testimony: Link clearup, replaced: [[Skewer → [[Flaktura Workshop Skewer) |
||
Line 59: | Line 59: | ||
*'''02: Cylix:''' During [[Foundation (Halo Infinite)|Foundation]], at the end of the large room with the two light bridges, this audio log is located next to the exit door. | *'''02: Cylix:''' During [[Foundation (Halo Infinite)|Foundation]], at the end of the large room with the two light bridges, this audio log is located next to the exit door. | ||
*'''03: Harbinger:''' On the ground below [[The Tower]], this audio log is inside a Banished container to the right after entering the compound via the main entrance. | *'''03: Harbinger:''' On the ground below [[The Tower]], this audio log is inside a Banished container to the right after entering the compound via the main entrance. | ||
*'''04: Demon:''' Inside the mining laser at the [[Excavation Site]], this log is on a small raised viewpoint next to a [[Skewer]], behind the device's main control panel. | *'''04: Demon:''' Inside the mining laser at the [[Excavation Site]], this log is on a small raised viewpoint next to a [[Flaktura Workshop Skewer]], behind the device's main control panel. | ||
*'''05: Reformation:''' At the western AA Gun during [[Pelican Down (Halo Infinite level)|Pelican Down]], this audio log is on a table inside a Banished pre-fab building, to the left after riding the elevator. | *'''05: Reformation:''' At the western AA Gun during [[Pelican Down (Halo Infinite level)|Pelican Down]], this audio log is on a table inside a Banished pre-fab building, to the left after riding the elevator. | ||
*'''06: Home:''' Approaching the base of the elevator leading to the northern AA Gun during [[Pelican Down (Halo Infinite level)|Pelican Down]], hidden in the corner of a Banished pre-fab building to the left. | *'''06: Home:''' Approaching the base of the elevator leading to the northern AA Gun during [[Pelican Down (Halo Infinite level)|Pelican Down]], hidden in the corner of a Banished pre-fab building to the left. |