Era-human.png
Halopedia Era UNSC.png
HaloArray.png

Cold Storage Reports

From Halopedia, the Halo wiki

Revision as of 15:20, April 11, 2021 by PorpleBot (talk | contribs) (Text replacement - "==Related links==" to "==See also==")

The Cold Storage Reports are a series of reports filed by an unknown entity on Installation 05 following the outbreak of the Flood parasite. They were posted in two successive Bungie Weekly Updates in mid-2008 to hint at the upcoming release of the level Cold Storage.[1][2] The reports were later posted on Halo Waypoint.[3]

The report

Cold Storage Report One
REPORT: CONTAINMENT FAILURE
LF.Xx.3273 research and containment facility; [delta site] has experienced catastrophic specimen containment failure. All apertures into facility will be locked until further notice. Atmosphere evacuation and [reduction of ambient temperature] protocols have already been enacted. Request maintenance and security detail [at earliest opportunity]. [8 minutes] elapsed since initial containment failure.

REPORT: CONTAINMENT FAILURE
Waiting for maintenance and security detail. [32 minutes, 9 seconds] elapsed since request.

REPORT: CONTAINMENT FAILURE
Still waiting for maintenance and security detail. [24 hours] elapsed since request.

REPORT: SECURITY BREACH

LF.Xx.3273 research and containment facility; [delta site] has experienced a security breach via emergency [slip stream space] transportation conduits. Emergency [slip stream space] transportation conduits have been placed in recursive mode to contain unauthorized hostile life forms. Request emergency security detail. Still waiting for primary maintenance and security detail. [2512332 hours, 14 minutes, 6 seconds] elapsed since initial request. 

REPORT: DERELICTION OF DUTY
[[2401 Penitent Tangent]] has been lax in the areas of maintenance and security.
Cold Storage Report Two
LOG: QUERIED ADJACENT FACILITIES
LF.Xx.3273 research and containment facility [alpha, beta, gamma, epsilon, zeta, and kappa sites] have all replied [systems normal] within expected constraints. This would tend to signify that the containment failure was purely mechanical in nature; perhaps a manufacturing flaw. As no [outside agent] has accessed [delta site] in the past [874068942 hours, 4 minutes, 46 seconds]—[allowing for a 61360-hour, 54 minute, 2 second margin of error]—sabotage would seem unlikely.

LOG: REQUEST UNANSWERED
LF.Xx.3273 research and containment facility; [delta site] is currently being held at [.01 atm] / [184K]. Local maintenance and security hubs have failed to reply within expected constraints. [Bumping maintenance and security request up] to [quadrant oversight].

LOG: REQUEST UNANSWERED
LF.Xx.3273 research and containment facility; [delta site] is currently being held at [1 atm] / [278K] as atmospheric seals were showing signs of stress. [Quadrant oversight] has failed to reply within expected constraints. [Bumping maintenance and security request all the way up] to 2401 [PENITENT TANGENT].

LOG: UNAUTHORIZED ACCESS TO FACILITIES
LF.Xx.3273 research and containment facility; [delta site] emergency [slip stream space] transportation conduits have been accessed by unauthorized parties.

LOG: FILED COMPLAINT TO INSTALLATION 00
2401 [PENITENT TANGENT], monitor of Installation 05, has been lax in the areas of maintenance and security. Requests for aid in said areas have gone unanswered by both 2401 and [subservient] systems well beyond expected constraints.

Trivia

  • The first time stamp "2512332 hours, 14 minutes, 6 seconds" is the equivalent of 290 years, 7 months, 14 minutes, 6 seconds. The second time stamp is equivalent to 99,779 years, 204 days, 6 hours, 4 minutes, 46 seconds.
  • In the report, the installation's monitor, 2401 Penitent Tangent, is continuously accused of being lax in maintenance and security, implying that the report was filed by another intelligence within the facility, possibly the caretaker ancilla of the local Flood containment facility.

Sources

See also