A2 Hydroelectric Facility: Difference between revisions
From Halopedia, the Halo wiki
(need refference if not south, as it would require a paradigm shift.) |
mNo edit summary |
||
Line 5: | Line 5: | ||
'''A2 Hydroelectric Facility'''<ref>[http://screenshots.teamxbox.com/screen/66374/Halo-3/ TeamXbox Halo 3 Screenshot]</ref> is a hydroelectric dam in [[Tanzania]] in the [[East African Protectorate]]. Located along the [[Nkuu River]], it is a part of the [[Global Water Campaign]] installations in the jungle south of [[Mount Kilimanjaro]] supplying [[Dihydrogen Monoxide|water]] to the [[GWC Trans-African Pipelines]]. By the 26th century, while the [[Ghost Town (Level)|main facility]] of the GWC had fallen into disrepair, it seems that the dam was at least partially active by 2552 as evidenced by newer equipment present in the facility. | '''A2 Hydroelectric Facility'''<ref>[http://screenshots.teamxbox.com/screen/66374/Halo-3/ TeamXbox Halo 3 Screenshot]</ref> is a hydroelectric dam in [[Tanzania]] in the [[East African Protectorate]]. Located along the [[Nkuu River]], it is a part of the [[Global Water Campaign]] installations in the jungle south of [[Mount Kilimanjaro]] supplying [[Dihydrogen Monoxide|water]] to the [[GWC Trans-African Pipelines]]. By the 26th century, while the [[Ghost Town (Level)|main facility]] of the GWC had fallen into disrepair, it seems that the dam was at least partially active by 2552 as evidenced by newer equipment present in the facility. | ||
During the [[Battle of Earth]], after [[John-117]] was recovered from the jungle, [[Sergeant Major]] [[Avery Johnson]] was captured by [[Covenant Empire|Covenant]] [[Covenant Loyalist|forces]] and freed by [[John-117]] and [[Thel 'Vadam]]. The three of them and all surviving [[UNSC Marine Corps|Marines]] were then extracted by [[Kilo 23]].<ref>''[[Halo 3]] level, [[ | During the [[Battle of Earth]], after [[John-117]] was recovered from the jungle, [[Sergeant Major]] [[Avery Johnson]] was captured by [[Covenant Empire|Covenant]] [[Covenant Loyalist|forces]] and freed by [[John-117]] and [[Thel 'Vadam]]. The three of them and all surviving [[UNSC Marine Corps|Marines]] were then extracted by [[Kilo 23]].<ref>'''[[Halo 3]]''' level, ''[[Sierra 117]]''</ref> | ||
==Sources== | ==Sources== | ||
<references/> | <references/> | ||
[[Category: | [[Category:Infrastructure]] |
Revision as of 10:39, July 18, 2010
A2 Hydroelectric Facility[1] is a hydroelectric dam in Tanzania in the East African Protectorate. Located along the Nkuu River, it is a part of the Global Water Campaign installations in the jungle south of Mount Kilimanjaro supplying water to the GWC Trans-African Pipelines. By the 26th century, while the main facility of the GWC had fallen into disrepair, it seems that the dam was at least partially active by 2552 as evidenced by newer equipment present in the facility.
During the Battle of Earth, after John-117 was recovered from the jungle, Sergeant Major Avery Johnson was captured by Covenant forces and freed by John-117 and Thel 'Vadam. The three of them and all surviving Marines were then extracted by Kilo 23.[2]
Sources
- ^ TeamXbox Halo 3 Screenshot
- ^ Halo 3 level, Sierra 117