A2 Hydroelectric Facility: Difference between revisions
From Halopedia, the Halo wiki
BaconShelf (talk | contribs) m (→Gallery) |
(→Sources: replaced: <references/> → {{Ref/Sources}}) |
||
Line 17: | Line 17: | ||
==Sources== | ==Sources== | ||
{{Ref/Sources}} | |||
[[Category:Infrastructure]] | [[Category:Infrastructure]] |
Revision as of 14:45, June 6, 2020
The A2 Hydroelectric Facility[1] is a hydroelectric dam in Tanzania in the East African Protectorate. Located along an unidentified river, it is a part of the Global Water Campaign installations in the jungle south of Mount Kilimanjaro supplying water to the GWC Trans-African Pipelines. By the 26th century, while the main facility of the GWC had fallen into disrepair, it seems that the dam was at least partially active by 2552 as evidenced by newer equipment present in the facility.
During the Battle of Earth on November 17, 2552, after John-117 was recovered from the jungle, Sergeant Major Avery Johnson was captured by Covenant forces and freed by John-117 and Thel 'Vadam. The three of them and all surviving Marines were then extracted by Kilo 023.[2]
Gallery
Browse more images in this article's gallery page. |
List of appearances
- Halo 3 (First appearance)
Sources
- ^ TeamXbox Halo 3 Screenshot
- ^ Halo 3, campaign level Sierra 117