Halopedia Era UNSC.png
HaloArray.png

A2 Hydroelectric Facility: Difference between revisions

From Halopedia, the Halo wiki

(→‎Sources: replaced: <references/> → {{Ref/Sources}})
m (Added an image.)
Line 9: Line 9:
{{Linkbox|gallery=yes}}
{{Linkbox|gallery=yes}}
<gallery>
<gallery>
File:H3 HydroConcept.jpg|Early concept art of the facility.
File:H3_A2Hydro_Concept_1.jpg|Concept art of the facility.
File:H3_A2Hydro_Concept_1.jpg|Concept art of the facility.
File:H3_A2Hydro_Concept_2.jpg|Another concept of the water facilty.
File:H3_A2Hydro_Concept_2.jpg|Another concept of the water facilty.

Revision as of 13:23, September 13, 2021

This article is about the installation. For the weapon-mounted telescopic sight, see A2 Scope.
A2 Hydroelectric Facility.

The A2 Hydroelectric Facility[1] is a hydroelectric dam in Tanzania in the East African Protectorate. Located along an unidentified river, it is a part of the Global Water Campaign installations in the jungle south of Mount Kilimanjaro supplying water to the GWC Trans-African Pipelines. By the 26th century, while the main facility of the GWC had fallen into disrepair, it seems that the dam was at least partially active by 2552 as evidenced by newer equipment present in the facility.

During the Battle of Earth on November 17, 2552, after John-117 was recovered from the jungle, Sergeant Major Avery Johnson was captured by Covenant forces and freed by John-117 and Thel 'Vadam. The three of them and all surviving Marines were then extracted by Kilo 023.[2]

Gallery

List of appearances

Sources

  1. ^ TeamXbox Halo 3 Screenshot
  2. ^ Halo 3, campaign level Sierra 117