Archive:Halo Waypoint/2014 to 2020/Universe/ONI Files: Difference between revisions
From Halopedia, the Halo wiki
Line 10: | Line 10: | ||
==Cold Storage Reports== | ==Cold Storage Reports== | ||
{{Article Quote|The following two excerpts offer insight into Delta Halo, Penitent Tangent and perhaps more importantly, the Flood.}} | {{Article Quote|The following two excerpts offer insight into Delta Halo, Penitent Tangent and perhaps more importantly, the Flood.}} | ||
Recovered from Installation 05 | |||
=== UPDATE 1: === | |||
==== REPORT: CONTAINMENT FAILURE ==== | |||
LF.Xx.3273 research and containment facility; [delta site] has experienced catastrophic specimen containment failure. All apertures into facility will be locked until further notice. Atmosphere evacuation and [reduction of ambient temperature] protocols have already been enacted. Request maintenance and security detail [at earliest opportunity]. [8 minutes] elapsed since initial containment failure. | |||
==== REPORT: CONTAINMENT FAILURE ==== | |||
Waiting for maintenance and security detail. [32 minutes, 9 seconds] elapsed since request. | |||
==== REPORT: CONTAINMENT FAILURE ==== | |||
Still waiting for maintenance and security detail. [24 hours] elapsed since request. | |||
==== REPORT: SECURITY BREACH ==== | |||
LF.Xx.3273 research and containment facility; [delta site] has experienced a security breach via emergency [slip stream space] transportation conduits. Emergency [slip stream space] transportation conduits have been placed in recursive mode to contain unauthorized hostile lifeforms. Request emergency security detail. Still waiting for primary maintenance and security detail. [2512332 hours, 14 minutes, 6 seconds] elapsed since initial request. | |||
==== REPORT: DERELICTION OF DUTY ==== | |||
2401 [PENITENT TANGENT] has been lax in the areas of maintenance and security. | |||
=== UPDATE 2: === | |||
==== LOG: QUERIED ADJACENT FACILITIES ==== | |||
LF.Xx.3273 research and containment facility [alpha, beta, gamma, epsilon, zeta, and kappa sites] have all replied [systems normal] within expected constraints. This would tend to signify that the containment failure was purely mechanical in nature; perhaps a manufacturing flaw. As no [outside agent] has accessed [delta site] in the past [874068942 hours, 4 minutes, 46 seconds]—[allowing for a 61360 hour, 54, minute, 2 second margin of error]—sabotage would seem unlikely. | |||
==== LOG: REQUEST UNANSWERED ==== | |||
LF.Xx.3273 research and containment facility; [delta site] is currently being held at [.01 atm] / [184K]. Local maintenance and security hubs have failed to reply within expected constraints. [Bumping maintenance and security request up] to [quadrant oversight]. | |||
==== LOG: REQUEST UNANSWERED ==== | |||
LF.Xx.3273 research and containment facility; [delta site] is currently being held at [1 atm] / [278K] as atmospheric seals were showing signs of stress. [Quadrant oversight] has failed to reply within expected constraints. [Bumping maintenance and security request all the way up] to 2401 [PENITENT TANGENT]. | |||
==== LOG: UNAUTHORIZED ACCESS TO FACILITIES ==== | |||
LF.Xx.3273 research and containment facility; [delta site] emergency [slip stream space] transportation conduits have been accessed by unauthorized parties. | |||
==== | |||
LOG: FILED COMPLAINT TO INSTALLATION 00 ==== | |||
2401 [PENITENT TANGENT], monitor of Installation 05, has been lax in the areas of maintenance and security. Requests for aid in said areas have gone unanswered by both 2401 and [subservient] systems well beyond expected constraints. | |||
<gallery> | <gallery> | ||
File:Forerunner_Waypoint.jpeg | File:Forerunner_Waypoint.jpeg |
Revision as of 09:22, March 5, 2017
Conversations from the Universe
- Main article: Conversations_from_the_Universe
Cold Storage Reports
Recovered from Installation 05
UPDATE 1:
REPORT: CONTAINMENT FAILURE
LF.Xx.3273 research and containment facility; [delta site] has experienced catastrophic specimen containment failure. All apertures into facility will be locked until further notice. Atmosphere evacuation and [reduction of ambient temperature] protocols have already been enacted. Request maintenance and security detail [at earliest opportunity]. [8 minutes] elapsed since initial containment failure.
REPORT: CONTAINMENT FAILURE
Waiting for maintenance and security detail. [32 minutes, 9 seconds] elapsed since request.
REPORT: CONTAINMENT FAILURE
Still waiting for maintenance and security detail. [24 hours] elapsed since request.
REPORT: SECURITY BREACH
LF.Xx.3273 research and containment facility; [delta site] has experienced a security breach via emergency [slip stream space] transportation conduits. Emergency [slip stream space] transportation conduits have been placed in recursive mode to contain unauthorized hostile lifeforms. Request emergency security detail. Still waiting for primary maintenance and security detail. [2512332 hours, 14 minutes, 6 seconds] elapsed since initial request.
REPORT: DERELICTION OF DUTY
2401 [PENITENT TANGENT] has been lax in the areas of maintenance and security.
UPDATE 2:
LOG: QUERIED ADJACENT FACILITIES
LF.Xx.3273 research and containment facility [alpha, beta, gamma, epsilon, zeta, and kappa sites] have all replied [systems normal] within expected constraints. This would tend to signify that the containment failure was purely mechanical in nature; perhaps a manufacturing flaw. As no [outside agent] has accessed [delta site] in the past [874068942 hours, 4 minutes, 46 seconds]—[allowing for a 61360 hour, 54, minute, 2 second margin of error]—sabotage would seem unlikely.
LOG: REQUEST UNANSWERED
LF.Xx.3273 research and containment facility; [delta site] is currently being held at [.01 atm] / [184K]. Local maintenance and security hubs have failed to reply within expected constraints. [Bumping maintenance and security request up] to [quadrant oversight].
LOG: REQUEST UNANSWERED
LF.Xx.3273 research and containment facility; [delta site] is currently being held at [1 atm] / [278K] as atmospheric seals were showing signs of stress. [Quadrant oversight] has failed to reply within expected constraints. [Bumping maintenance and security request all the way up] to 2401 [PENITENT TANGENT].
LOG: UNAUTHORIZED ACCESS TO FACILITIES
LF.Xx.3273 research and containment facility; [delta site] emergency [slip stream space] transportation conduits have been accessed by unauthorized parties.
==
LOG: FILED COMPLAINT TO INSTALLATION 00 ==== 2401 [PENITENT TANGENT], monitor of Installation 05, has been lax in the areas of maintenance and security. Requests for aid in said areas have gone unanswered by both 2401 and [subservient] systems well beyond expected constraints.