Canon

A2 Hydroelectric Facility: Difference between revisions

From Halopedia, the Halo wiki

m (I know Johnson's a Sergeant Major, not a Sergeant.)
No edit summary
 
(30 intermediate revisions by 15 users not shown)
Line 1: Line 1:
{{era|H3}}
{{Status|Canon}}
{{ratings}}
{{disambig header|the installation|the weapon-mounted telescopic sight|A2 Scope}}
{{disambig header|the installation|the weapon-mounted telescopic sight|A2 Scope}}
{{stub}}
[[File:A2Dam_2.jpg|thumb|250px|A2 Hydroelectric Facility.]]
'''A2''' was a dam of the [[Voi|Voi Municipal Water Organization]].<ref>[http://screenshots.teamxbox.com/screen/66374/Halo-3/] TeamXbox Halo 3 Screenshot</ref> It makes its only appearance on the [[Halo 3]] level [[Sierra 117 (Level)| Sierra 117]] where [[Sergeant Major]] [[Avery Johnson]] was captured by [[Covenant]] [[Covenant Loyalist|forces]] and freed by [[John-117]] and [[Thel 'Vadam]]. The three of them and all surviving Marines were then extracted by [[Kilo 23]].
The '''A2 Hydroelectric Facility'''<ref>[http://screenshots.teamxbox.com/screen/66374/Halo-3/ TeamXbox Halo 3 Screenshot]</ref> is a hydroelectric dam in [[Tanzania]] in the [[East African Protectorate]]. Located along an unidentified river, it is a part of the [[Global Water Campaign]] installations in the jungle south of [[Mount Kilimanjaro]] supplying [[water]] to the [[GWC Trans-African Pipelines]]. By the 26th century, while the [[ghost Town|main facility]] of the GWC had fallen into disrepair, it seems that the dam was at least partially active by 2552 as evidenced by newer equipment present in the facility.
 
During the [[Battle for Earth]] on [[2552#November|November 17, 2552]], after [[John-117]] was recovered from the jungle, [[Sergeant Major]] [[Avery Junior Johnson|Avery Johnson]] was captured by [[Covenant Empire|Covenant]] [[Covenant military|forces]] and freed by [[John-117]] and [[Thel 'Vadam]]. The three of them and all surviving [[UNSC Marine Corps|Marines]] were then extracted by ''[[Kilo 023]]''.{{Ref/Level|H3|Sierra 117}}
 
==Gallery==
{{Linkbox|gallery=yes}}
<gallery>
File:H3 Dam concept.jpg|An early sketch of the dam.
File:H3 HydroConcept.jpg|Early concept art of the facility.
File:H3_A2Hydro_Concept_1.jpg|Concept art of the facility.
File:H3_A2Hydro_Concept_2.jpg|Another concept of the water facilty.
</gallery>
 
==List of appearances==
*''[[Halo 3]]'' {{1st}}


==Sources==
==Sources==
<references/>
{{Ref/Sources}}
<br />
 
[[Category:Places]]
[[Category:Africa]]
[[Category:Infrastructure]]

Latest revision as of 18:09, August 12, 2022

This article is about the installation. For the weapon-mounted telescopic sight, see A2 Scope.
A2 Hydroelectric Facility.

The A2 Hydroelectric Facility[1] is a hydroelectric dam in Tanzania in the East African Protectorate. Located along an unidentified river, it is a part of the Global Water Campaign installations in the jungle south of Mount Kilimanjaro supplying water to the GWC Trans-African Pipelines. By the 26th century, while the main facility of the GWC had fallen into disrepair, it seems that the dam was at least partially active by 2552 as evidenced by newer equipment present in the facility.

During the Battle for Earth on November 17, 2552, after John-117 was recovered from the jungle, Sergeant Major Avery Johnson was captured by Covenant forces and freed by John-117 and Thel 'Vadam. The three of them and all surviving Marines were then extracted by Kilo 023.[2]

Gallery[edit]

List of appearances[edit]

Sources[edit]