A2 Hydroelectric Facility: Difference between revisions

From Halopedia, the Halo wiki

No edit summary
m (moved A2 to A2 Hydroelectric Facility: more descriptive, actual title.)
(No difference)

Revision as of 12:19, January 14, 2010

Template:Ratings

This article is about the installation. For the weapon-mounted telescopic sight, see A2 Scope.

A2[1] is a hydroelectric dam in the East African Protectorate, and a part of the Global Water Campaign installations in the jungle near Mount Kilimanjaro supplying water to the GWC Trans-African Pipelines. By the 26th century, while the main facility of the GWC had fallen into disrepair, it seems that the dam was at least partially active by 2552 as evidenced by newer equipment present in the facility.

During the opening stages of the Battle of Voi, after John-117 was recovered from the jungle, Sergeant Major Avery Johnson was captured by Covenant forces and freed by John-117 and Thel 'Vadam. The three of them and all surviving Marines were then extracted by Kilo 23.[2]

Sources

Era-rw.png This article is a stub. You can help Halopedia by expanding it.